Vai al contenuto principale
Studio Carlo Cassarino
Ruins of the Palatine Hill overlooking the Circus Maximus valley in the warm light of sunset, Rome

Understand buildings to design their future.

Struc­tur­al, fire safe­ty and en­er­gy en­gi­neer­ing for pub­lic ad­min­is­tra­tions, hos­pi­tal­i­ty prop­er­ties and his­toric es­tates.As­sess­ments, de­sign and works su­per­vi­sion for ex­ist­ing build­ings and new con­struc­tion.The prac­tice serves clients through­out Italy from Rome and the province of Syra­cuse.

  • OIR No. 30948
  • Registered fire prevention professional, D.M. 05/08/2011
  • Adviser to Defence Bodies and International Organisations
Aranova weather radar tower photographed from below
Construction drawing showing the elevations of the Aranova tower
  • OIR No. 30948
  • Registered fire prevention professional, D.M. 05/08/2011
  • Adviser to Defence Bodies and International Organisations

A single contact for building assessments.

En­gi­neer­ing ser­vices for pub­lic build­ings, hos­pi­tal­i­ty prop­er­ties and com­plex es­tates. As­sess­ments es­tab­lish safe­ty con­di­tions, ap­plic­a­ble re­quire­ments and in­ter­ven­tion pri­or­i­ties.

Public administrations

Contacts: project of­fi­cers and tech­ni­cal de­part­ments

Seis­mic as­sess­ments, de­sign, works su­per­vi­sion and statu­to­ry in­spec­tions for pub­lic build­ings. The as­sess­ments help plan in­ter­ven­tions and man­age the re­quired fil­ings.

Hotels and hospitality

Contacts: own­ers and man­age­ment

Fire safe­ty re­quire­ments and struc­tur­al and en­er­gy as­sess­ments co­or­di­nat­ed with on­go­ing op­er­a­tions. As­sess­ments start from the build­ing and the ap­plic­a­ble oblig­a­tions.

Foundations and private estates

Contacts: own­ers and es­tate man­agers

Ex­ist­ing and his­toric buildings: as­sess­ing is­sues, con­straints and in­ter­ven­tion pri­or­i­ties for those re­spon­si­ble for man­ag­ing and pre­serv­ing a prop­er­ty port­fo­lio over time.

Define the assignment to be commissioned

An en­quiry can con­cern a sin­gle spe­cial­ist ser­vice. In­te­grat­ed Di­ag­no­sis is ap­pro­pri­ate when sev­er­al as­pects of the build­ing need to be as­sessed to­geth­er.

Assessments and design for public buildings

For project of­fi­cers and tech­ni­cal departments: seis­mic vul­ner­a­bil­i­ty as­sess­ments, in­ves­ti­ga­tions, struc­tur­al and fire-safe­ty de­sign, works su­per­vi­sion and statu­to­ry in­spec­tions, as sin­gle ser­vices or a co­or­di­nat­ed as­sign­ment.

Fire safety for hospitality properties

For own­ers and man­agers plan­ning al­ter­ations, re­view­ing ex­ist­ing doc­u­men­ta­tion or defin­ing a fire-safe­ty as­sign­ment. Scope may cover an as­sess­ment, de­sign or the ap­plic­a­ble fil­ing.

Specialist collaboration with design practices

Struc­tur­al and fire-safe­ty ser­vices with­in a wider project. Re­spon­si­bil­i­ties, de­liv­er­ables and in­ter­faces with the other de­sign­ers are de­fined for each as­sign­ment.

Selected assignments

The prob­lem, the tech­ni­cal de­ci­sion and the doc­u­ment­ed out­come of three as­sign­ments.

Public building in its existing condition

Assess first, then design

A multi­use pub­lic build­ing re­quired doc­u­men­tary and cadas­tral re­con­struc­tion be­fore de­sign could pro­ceed.

Read the case
Completed illuminated footbridge

Building an accessible footbridge

Mov­ing the en­trance re­solved the level dif­fer­ence and made an ac­ces­si­ble pedes­tri­an link pos­si­ble.

Read the case
Roof works during rehabilitation

One building, multiple owners

Strength­en­ing a pub­licly owned por­tion re­quired as­sess­ing the whole build­ing, in­clud­ing ad­join­ing parts.

Read the case
How the practice works

Assessments guide the design.

In­te­grat­ed Di­ag­no­sis con­sid­ers the build­ing as a whole: struc­tur­al de­ci­sions can af­fect fire safe­ty, com­part­men­ta­tion can af­fect the en­ve­lope, and en­er­gy im­prove­ments can af­fect struc­tur­al loads. Con­sid­er­ing the as­sess­ments to­geth­er helps eval­u­ate how tech­ni­cal de­ci­sions af­fect one an­oth­er and es­tab­lish pri­or­i­ties be­fore de­sign be­gins.

Circular dependency between the three disciplinesStructure constrains fire compartmentation, which affects the thermal envelope. The envelope adds loads to the structure. Optimising each field requires considering its effects on the other two.StructureFire safetyEnvelopeconstrainscompartmentationconditionsthe insulationaddsloads
Decisions about structure, fire safety and the envelope affect one another.

Projects and confidentiality.

The se­lect­ed as­sign­ments show tech­ni­cal de­ci­sions and doc­u­ment­ed phas­es. Client names and ad­dress­es are omit­ted from the text, though im­ages may iden­ti­fy a build­ing. Con­fi­den­tial as­sign­ments are ex­clud­ed. Ref­er­ences and sup­port­ing doc­u­ments are avail­able on re­quest.

Define the next assignment

Please indicate the building, municipality, requirement and timing. The initial discussion helps define the assignment and the information needed for a fee proposal.

Contact the practice