Vai al contenuto principale
Studio Carlo Cassarino
Aerial view of a degraded existing building in the Roman urban fabric, with large windows and deteriorated concrete at the cornice — building subject to integrated structural, fire safety and energy diagnosis

Integrated building assessment

Struc­tur­al En­gi­neer­ing, Fire Safe­ty and Energy: as­sess­ments con­sid­ered to­geth­er to iden­ti­fy is­sues and in­ter­ven­tion pri­or­i­ties.

Technical decisions are assessed together.

In a com­plex build­ing, a struc­tur­al de­ci­sion can af­fect fire safe­ty or build­ing ser­vices; an en­er­gy mea­sure can change loads and con­struc­tion de­tails. Bring­ing the as­sess­ments to­geth­er helps eval­u­ate how tech­ni­cal de­ci­sions af­fect one an­oth­er and set pri­or­i­ties be­fore in­ter­ven­tions are de­signed.

Separate assessments
When several specialists are involved, findings and decisions need explicit coordination.
Integrated Diagnosis
One responsible professional assesses the building across three fields and coordinates any further investigation.

Two as­sign­ments show how spe­cial­ist dis­ci­plines come to­geth­er in the re­fur­bish­ment of a pub­lic build­ing and the ex­ten­sion of a nurs­ery.

Public building in its existing condition

Understand the building before designing

Doc­u­men­tary and cadas­tral re­view of the build­ing, with func­tion­al and fire-safe­ty de­sign for the rel­e­vant por­tion.

Read the case
Nursery extension during construction

A nursery extension followed through to site close-out

Final de­sign re­view and works su­per­vi­sion, with the prac­tice lead­ing the pro­fes­sion­al team. Co­or­di­na­tion of struc­ture, build­ing sys­tems and fire safe­ty.

Read the case

The Integrated Diagnosis process

  1. 01

    Integrated assessment

    Doc­u­ment re­view, site vis­its and in­ves­ti­ga­tions as need­ed to as­sess struc­ture, fire safe­ty and en­er­gy per­for­mance to­geth­er.

  2. 02

    Review of findings

    Re­view of find­ings and pri­or­i­ties, sep­a­rat­ing de­ci­sions that can be made from mat­ters re­quir­ing fur­ther in­ves­ti­ga­tion.

  3. 03

    Coordinated design

    Com­par­i­son of struc­tur­al, en­ve­lope and build­ing-ser­vices de­ci­sions to check com­pat­i­bil­i­ty.

  4. 04

    Filings

    Man­age­ment of ap­plic­a­ble struc­tur­al, fire and en­er­gy fil­ings, with a sin­gle tech­ni­cal con­tact for the com­pe­tent au­thor­i­ties.

Indicative timing by phase

1. Integrated assessment
Indicative duration
2-4 weeks
Phase outcome
documents, site visits as needed and assessment across the three disciplines
2. Review of findings
Indicative duration
—
Phase outcome
findings, priorities and investigations still needed
3. Coordinated design
Indicative duration
4-8 weeks
Phase outcome
design coordinating structure, envelope and building services
4. Filings
Indicative duration
variable
Phase outcome
Structural, fire and energy filings, as applicable to the project

Questions about Integrated Diagnosis

Regulatory content updated 31 July 2026

Coordinated building assessments

For information about coordinating assessments and defining the technical approach.

Contact the practice